<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	>

<channel>
	<title>Worromontogus Lake Association</title>
	<atom:link href="http://www.togusponds.org/feed" rel="self" type="application/rss+xml" />
	<link>http://www.togusponds.org</link>
	<description>TogusPonds.org</description>
	<pubDate>Mon, 30 Nov 2009 19:45:27 +0000</pubDate>
	<generator>http://wordpress.org/?v=2.6.3</generator>
	<language>en</language>
			<item>
		<title>319 GRANT FALL 2009 REPORT</title>
		<link>http://www.togusponds.org/archives/261</link>
		<comments>http://www.togusponds.org/archives/261#comments</comments>
		<pubDate>Tue, 29 Sep 2009 12:12:54 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[LAKE INFO]]></category>

		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/?p=261</guid>
		<description><![CDATA[Sept 2009  Report on progress of 319 grants to road assn. and private property owners. By Patt Williams
The 319 Grant is coming to a close.  The  collaboration with the City of Augusta has worked and worked well.  We have  enjoyed working with Mr. Jerry Dostie who is the City&#8217;s representative to our  [...]]]></description>
			<content:encoded><![CDATA[<p>Sept 2009  Report on progress of 319 grants to road assn. and private property owners. By Patt Williams</p>
<p>The 319 Grant is coming to a close.  The  collaboration with the City of Augusta has worked and worked well.  We have  enjoyed working with Mr. Jerry Dostie who is the City&#8217;s representative to our  Technical Committee and with both Gerard Roy and Dan Nichols who have handled  administrative functions for the City.  The result has been a smoothly operating  project that has major road projects on The Albee, Hayes Landing, Tasker,  Woodard, Young Roads; at the WLA Landing and at four homeowner sites.  We have  nearly fully utilized the project&#8217;s funds in both the grant&#8217;s project&#8217;s and  technical assistance lines.  We have come to the point where we have more  applicancations than we have funds available and thus, no more application are  being requested.  This project has involved the time and energy of a number of  WLA members and Friends.  We need to thank Mr. John Pucciarelli, Chair of the  Technical Committee (T.C.), Mr. Dennis Curtis of the T.C., Dr. Melissa Laser of  the T.C., Cindy Eurich of the WLA Landing Committee, all WLA members who spent  lots of time on this project.  We also need to recognize Mr. Josh Platt of the  Kennebec County Soil and Water Conservation District (KCSWCD) who worked long  and hard to make these projects into the successes that they are.  A special  thanks to the KCSWCD for agreeing to provide whatever services necessary, beyond  those funded in the grant, as in-kind contributions to assure the success of the  project as a whole.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/261/feed</wfw:commentRss>
		</item>
		<item>
		<title>WLA Boat Landing Project  Sept. 12th 2009</title>
		<link>http://www.togusponds.org/archives/252</link>
		<comments>http://www.togusponds.org/archives/252#comments</comments>
		<pubDate>Fri, 04 Sep 2009 11:36:42 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[LAKE INFO]]></category>

		<category><![CDATA[NEXT EVENT]]></category>

		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/?p=252</guid>
		<description><![CDATA[What: Worromontogus Lake Assocation Boat Landing Buffer Improvement Project
When: Saturday, September 12, 2009
Why: For the sake of the lake!
What: Support the creation of a lake shore line buffer.
How: Bring a smile and a shovel to help prepare rain gardenbeds, plant vegetion, spread erosion control, beautify the area.
Who: It can be you! Contact Cindy Eurich 623-2675
]]></description>
			<content:encoded><![CDATA[<p>What: Worromontogus Lake Assocation Boat Landing Buffer Improvement Project</p>
<p>When: Saturday, September 12, 2009</p>
<p>Why: For the sake of the lake!</p>
<p>What: Support the creation of a lake shore line buffer.</p>
<p>How: Bring a smile and a shovel to help prepare rain gardenbeds, plant vegetion, spread erosion control, beautify the area.</p>
<p>Who: It can be you! Contact Cindy Eurich 623-2675</p>
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/252/feed</wfw:commentRss>
		</item>
		<item>
		<title>Aquatic Plant Identification Workshop</title>
		<link>http://www.togusponds.org/archives/250</link>
		<comments>http://www.togusponds.org/archives/250#comments</comments>
		<pubDate>Thu, 06 Aug 2009 01:24:18 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/?p=250</guid>
		<description><![CDATA[Aquatic Plant Identification Workshop 1:00 to 6:30 PM
University of Maine at Farmington 101 Roberts
Contact Rebecca Kurtz at 864-7311 or e-mail rkurtz@rlht.org
]]></description>
			<content:encoded><![CDATA[<p>Aquatic Plant Identification Workshop 1:00 to 6:30 PM</p>
<p>University of Maine at Farmington 101 Roberts</p>
<p>Contact Rebecca Kurtz at 864-7311 or e-mail rkurtz@rlht.org</p>
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/250/feed</wfw:commentRss>
		</item>
		<item>
		<title>WLA SUMMER PICNIC AT THE LANDING</title>
		<link>http://www.togusponds.org/archives/248</link>
		<comments>http://www.togusponds.org/archives/248#comments</comments>
		<pubDate>Sun, 19 Jul 2009 19:15:27 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/?p=248</guid>
		<description><![CDATA[Aug 8th WLA Summer Picnic at the landing. Starts at noon. WLA provides Hamburgers and Hot Dogs. Bring your own drinks. Come by boat, bike, kayak just get there. bring a neighbor and meet new members. IMPORTANT VOTE ON TOGUS DAM FISHLADDER WILL BE TAKEN.
]]></description>
			<content:encoded><![CDATA[<p>Aug 8th WLA Summer Picnic at the landing. Starts at noon. WLA provides Hamburgers and Hot Dogs. Bring your own drinks. Come by boat, bike, kayak just get there. bring a neighbor and meet new members. IMPORTANT VOTE ON TOGUS DAM FISHLADDER WILL BE TAKEN.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/248/feed</wfw:commentRss>
		</item>
		<item>
		<title>Newsletters 2009</title>
		<link>http://www.togusponds.org/archives/187</link>
		<comments>http://www.togusponds.org/archives/187#comments</comments>
		<pubDate>Sun, 17 May 2009 20:37:09 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[Uncategorized]]></category>

		<category><![CDATA[Add new tag]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/?p=187</guid>
		<description><![CDATA[november2009news
september2009wlanews3

july2009wlanews5
April
]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.togusponds.org/wp-content/uploads/2009/11/november2009news.pdf">november2009news</a></p>
<p><a href="http://www.togusponds.org/wp-content/uploads/2009/11/november2009news.pdf"></a><a rel="attachment wp-att-311" href="http://www.togusponds.org/archives/187/september2009wlanews3">september2009wlanews3</a></p>
<p><a href="http://www.togusponds.org/wp-content/uploads/2009/05/march2009wlanews.pdf"><br />
</a><a href="http://www.togusponds.org/wp-content/uploads/2009/10/july2009wlanews5.pdf">july2009wlanews5</a></p>
<p><a href="http://www.togusponds.org/wp-content/uploads/2009/10/july2009wlanews5.pdf"></a><a href="http://www.togusponds.org/wp-content/uploads/2009/05/march2009wlanews.pdf">April</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/187/feed</wfw:commentRss>
		</item>
		<item>
		<title>Webber Pond Fish Ladder Operational May5th 2009.</title>
		<link>http://www.togusponds.org/archives/184</link>
		<comments>http://www.togusponds.org/archives/184#comments</comments>
		<pubDate>Tue, 05 May 2009 19:22:32 +0000</pubDate>
		<dc:creator>Dick</dc:creator>
		
		<category><![CDATA[LAKE INFO]]></category>

		<category><![CDATA[NEXT EVENT]]></category>

		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/?p=184</guid>
		<description><![CDATA[
]]></description>
			<content:encoded><![CDATA[
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/184/feed</wfw:commentRss>
		</item>
		<item>
		<title>319 Grant   Steering Committee Meeting</title>
		<link>http://www.togusponds.org/archives/141</link>
		<comments>http://www.togusponds.org/archives/141#comments</comments>
		<pubDate>Fri, 27 Mar 2009 15:52:30 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[LAKE INFO]]></category>

		<category><![CDATA[NEXT EVENT]]></category>

		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/?p=141</guid>
		<description><![CDATA[April 1st 319 Grant  Steering Committee Meeting at Kennebec County Soil and Water District.  Will be held in the conference room at 1:00 PM
]]></description>
			<content:encoded><![CDATA[<p>April 1st 319 Grant  Steering Committee Meeting at Kennebec County Soil and Water District.  Will be held in the conference room at 1:00 PM</p>
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/141/feed</wfw:commentRss>
		</item>
		<item>
		<title>Dam Protocol</title>
		<link>http://www.togusponds.org/archives/86</link>
		<comments>http://www.togusponds.org/archives/86#comments</comments>
		<pubDate>Mon, 02 Feb 2009 20:43:59 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/?p=86</guid>
		<description><![CDATA[
The main dam on the Togus system is located at the south end of Lower Togus pond, just north of the intersection of of routes 17 and 226 in Chelsea.  It is owned by WLA and is the only gated or controlled outlet on the ponds, with a maximum discharge reported at 390 cubic feet [...]]]></description>
			<content:encoded><![CDATA[<div id="attachment_88" class="wp-caption alignleft" style="width: 250px"><a href="http://www.togusponds.org/wp-content/uploads/2009/02/spillway-diagramemail-jpeg.jpg"><img class="size-medium wp-image-88" title="Spillway Diagram" src="http://www.togusponds.org/wp-content/uploads/2009/02/spillway-diagramemail-jpeg-300x177.jpg" alt="Spillway Diagram" width="240" height="142" /></a><p class="wp-caption-text">Spillway Diagram</p></div>
<p>The main dam on the Togus system is located at the south end of Lower Togus pond, just north of the intersection of of routes 17 and 226 in Chelsea.  It is owned by WLA and is the only gated or controlled outlet on the ponds, with a maximum discharge reported at 390 cubic feet per second.  The main gateway/spillway is a 25&#8242; long concrete barrier with an upper surface that is about 7&#8242; above the level of the average downstream tailwaters; this spillway represents the lowest desireable pond water level in most situations.  The upper surface of a 9&#8243; thick fixed concrete walkway is 32&#8243; above the spillway.  This walkway surface represents the &#8220;flood&#8221; stage of the pond, and serves as our reference &#8220;datum&#8221;; all water level measurements are given as a distance below the top of the walkway.  The free space between these two fixed concrete barriers allows placement of 12&#8243; boards to retain water during dry times of the year.  These boards are the major means of water level control on the ponds, allowing a 12&#8243; adjustment to what would otherwise be an unmanaged water level.</p>
<p>A secondary gateway is located at a penstock several feet from the main spillway.  This gateway utilizes a number of 6” X 6” stoplogs, each 6’ long, that allow a more precise flow of water to a conduit at the base of the dam, presumably for the original purpose of driving long-removed mill machinery.  The stoplogs run in channels extending  downward almost to the level of the tailwaters.  The secondary gateway will not discharge as much water as the primary in most circumstances, but can be employed to draw down the ponds during low-flow periods for purposes of dam maintenance, etc.; it was a failure at this secondary gateway that resulted in a drop in water level of several feet in 2000.  Because there is always a small amount of leakage at these stoplogs some downstream flow is maintained even when pond water levels fall below the spillway level during prolonged dry periods.</p>
<p>The “back dam” is an uncontrolled (ungated) rock/earthen dam located on an undeveloped lobe on the southeast end of Lower Togus Pond.  It is about 100’ long and 5’ high.  This dam is currently owned by a local construction company.  Unlike the primary dam the trees and bushes that have taken root on the back dam are probably beneficial, serving to hold it together.  It is a leaky dam, forming a small stream that flows southward before joining Togus Stream below Route 17.  Since it’s crest is near datum on the main dam the back dam would serve as a safety spillway during extreme flood events.  Damage to or loss of the back dam would lower the pond water levels by up to five feet.</p>
<div id="attachment_87" class="wp-caption alignleft" style="width: 310px"><a href="http://www.togusponds.org/wp-content/uploads/2009/02/spillway-viewed-from-downstream-email.jpg"><img class="size-medium wp-image-87" title="Spillway viewed from downstream" src="http://www.togusponds.org/wp-content/uploads/2009/02/spillway-viewed-from-downstream-email-300x225.jpg" alt="Spillway viewed from downstream" width="300" height="225" /></a><p class="wp-caption-text">Spillway viewed from downstream</p></div>
<p>State and municipal laws can be utilized to address individual lake/pond water levels, but in most cases control of the water levels is left to the owner/operator of the dam.  DEP provides guidance on water levels at <a href="http://www.maine/dep/blwq/doclake/waterlevel.htm" target="_blank">www.maine/dep/blwq/doclake/waterlevel.htm</a> , and will, upon petition, hold a public hearing and ultimately issue an order establishing a water level regime based on potential impacts to safety, access, fish and wildlife habitat, erosion, and water supplies.</p>
<p>On the Togus ponds, WLA management goals have targeted the highest water levels of the year for the period following spring runoff; water levels at this time may approach datum (i.e. &#8220;0&#8243; inches) though we try to stay a few inches below this.  While the water levels have risen ABOVE datum in recent memory during extreme flood events (e.g. the flood of &#8216;87) this presents an undesireable situation to the integrity of the dam and also floods a few backyards and low cellars on the ponds.  During an average year the water level would slowly drop from a high in March-April of 8&#8243;-or-so below datum through the summer.  The three main spillway boards would be placed at some time during the summer, though one or all might be removed temporarily in anticipation of heavy rain.  Our goal during the spring/summer/early-fall is to maintain a fairly steady, slowly dropping water level throughout these seasons, but without constantly removing-replacing boards every time rain is forecast.  Finally, sometime in October all three of the spillway boards are removed to allow the water levels to drop to what should be the lowest levels of the year prior to ice forming; this helps to prevent shoreline ice damage as well as provide for additional storage before the next years&#8217; spring runoff.  This 32&#8243; maximum range is what we currently work with, and in normal years the working range is closer to 24&#8243; between seasonal high/low waters.  A typical season, then, might see water levels within a few inches either side of 8&#8243; below datum in March-April, dropping to 18&#8243; b.d. in June-July and 28&#8243; b.d. through the fall.</p>
<p>We suspect that water levels measured at the dam are USUALLY lower than the static water level on Togus Pond (upper), sometimes by several inches, because of the lag time involved as the flow finds its way to the outlet.  Due to the nature of the drainage, during extremely heavy rain events the flow reverses and water floods northward from Lower Togus Pond into Togus - - in this situation water level measured at the dam would be expected to be slightly higher than at Togus.  We haven&#8217;t as yet established a water level measuring location on Togus Lake that is correlated to the dam and also accessible to anyone that is interested in recording the level at any given time; perhaps a metering stick can be placed at the WLA boat launch or near Route 105 at some point.</p>
<p>Though not without occasional management gliches and hiccups the Togus ponds have so far avoided the water level controversies that have plagued some lakes and ponds in Maine.  Water level maintenance can become a pretty contentious issue.  Anyone who has concerns that the water level is either too high or low at any particular time should first confirm whether it is within the target range given above; on rare occasion we may lower the water levels a little more or a little earlier than usual for road or dam maintenance purposes, and hope that folks will understand our reasoning on this.  We understand that some properties are low, and so their owners would prefer a lower average water level; other property owners lament the weedy mudflats that stand between their dock and the deep beyond, and so prefer higher levels.  We can&#8217;t please everyone all the time, but we&#8217;ll try to keep the discontent to a minimum as best we can.  While the Dam Comittee chairman - - or any of the Association officers - - can be contacted with concerns or comments regarding water levels, the WLA web-site &#8220;forum&#8221; might also serve as a useful place to float ideas or to vent.</p>
<p>Jon Andrews<br />
This piece will also be archived under &#8220;Lake Info&#8221;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/86/feed</wfw:commentRss>
		</item>
		<item>
		<title>NEXT WLA EVENT</title>
		<link>http://www.togusponds.org/archives/71</link>
		<comments>http://www.togusponds.org/archives/71#comments</comments>
		<pubDate>Tue, 25 Nov 2008 19:26:11 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[LAKE INFO]]></category>

		<category><![CDATA[NEXT EVENT]]></category>

		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/?p=71</guid>
		<description><![CDATA[WLA  HOLIDAY PARTY FRIDAY DECEMBER 4TH 2009
Social time 5:30, Dinner 6:00 to 6:30, Yankee Swap 6:30
It is the time of year again to gather for winter! Please bring your favorite dish to share for potluck - either a main dish, salad, or desert and your own place setting. (to reduce garbage) and beverage. WLA will [...]]]></description>
			<content:encoded><![CDATA[<p>WLA  HOLIDAY PARTY FRIDAY DECEMBER 4TH 2009</p>
<p>Social time 5:30, Dinner 6:00 to 6:30, Yankee Swap 6:30</p>
<p>It is the time of year again to gather for winter! Please bring your favorite dish to share for potluck - either a main dish, salad, or desert and your own place setting. (to reduce garbage) and beverage. WLA will provide coffee and Tea. Also back by popular demand - the Yankee Swap! If you would like to participate, bring a $10. gift per personor per household.</p>
<p>Board and Officers will be avalible for questions and there may be a short meeting to deal with any issues requiring the members attention, but more importantly let&#8217;s get together and have some laughs! We&#8217;ll have a 50/50 raffle, and a chance to toast the season with your neighbors.</p>
<p>We are able to use the Foxglen Snowmobile clubhouse again and the snowmobile clubis providiny the clubhouse at no cost to the WLA, so we all owe them thanks for their hospitality.</p>
<p>The Fox Glen Snowmobile club house is located on Buck and Doe Trail: from rt 3 go .08 miles on weeks Mills Rd.to Buck and doe Trail, which is on the left. The club is the first building on the left on Buck and Doe Trail.</p>
<p>We hope to see you there!</p>
<p>WLA ANNUAL CHRISTMAS PARTY DEC. 4th 2009. At Foxglen Snowmobile Clubhouse. Details to follow.</p>
<p>WLA ANNUAL FALL MEETING OCT 23rd 2009. Fox Glen Snowmobile Clubhouse.</p>
<p>5;00 PM Social time, 5:30 Pot Luck dinner, 6:00 WLA general meeting.</p>
<p>Business that will be discussed, 319 grant review, committee reports and election of officers for the coming year. Please attend and bring a neighbor.</p>
<p>TOGUS POND ALEWIFE RESTORATION PUBLIC INFORMATIONAL  MEETING.</p>
<p>July 28th 4:30 to 6:30 at Augusta City Center Lecture Hall.  rm 135 16 Cony St. Augusta, Me</p>
<p>Staff from Maine DMR and IFW will give a short presentation on alwife restoration in the Kennebec River. They will also answer questions.</p>
<p>WLA Annual Summer Picnic at the landing. Aug 8th. Starts at noon. Come by boat,bike,paddle  any way you can. Hamburgers and Hot Dogs provided by WLA bring your own drinks.  WLA provides hamburgs and hotdogs. Bring your neighbors and meet new friends. THE IMPORTANT VOTE ON FISHLADDER PASSAGE WILL BE TAKEN AT THIS MEETING.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/71/feed</wfw:commentRss>
		</item>
		<item>
		<title>2008 WLA Newsletters &#038; Minutes</title>
		<link>http://www.togusponds.org/archives/34</link>
		<comments>http://www.togusponds.org/archives/34#comments</comments>
		<pubDate>Tue, 07 Oct 2008 23:13:59 +0000</pubDate>
		<dc:creator>admin</dc:creator>
		
		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://www.togusponds.org/archives/34</guid>
		<description><![CDATA[Newsletters
NEW: November 2008 Newsletter (PDF)
Fall 2008 Newsletter (PDF)
May 2008 Newsletter (PDF)
February 2008 Newsletter (PDF)
]]></description>
			<content:encoded><![CDATA[<h2>Newsletters</h2>
<p>NEW: <a href="http://www.togusponds.org/wp-content/uploads/2008/11/wla-newsletter-november-2008.pdf">November 2008 Newsletter (PDF)</a><a title="Fall 2008 Newsletter (PDF)" href="http://www.togusponds.org/wp-content/uploads/2008/10/wla-fall-2008-news.pdf"><br />
Fall 2008 Newsletter (PDF)</a><a title="May 2008 Newsletter (PDF)" href="http://www.togusponds.org/wp-content/uploads/2008/05/may-2008-wla-newsletter.pdf"><br />
May 2008 Newsletter (PDF)</a><br />
<a title="February 2008 Newsletter (PDF)" href="http://www.togusponds.org/wp-content/uploads/2008/02/february-2008-wla-newsletter.pdf">February 2008 Newsletter (PDF)</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.togusponds.org/archives/34/feed</wfw:commentRss>
		</item>
	</channel>
</rss>
